Capital Improvement Program

Print
Press Enter to show all options, press Tab go to next option
The purpose of the Capital Improvement Program (CIP) is to identify, prioritize, and construct projects that are needed to enhance or maintain the sewage collection system and the water distribution system. The projects are prioritized on the basis of health concerns, water quality concerns, growth, regulatory requirements, component reliability, system benefit, and financial needs. The CIP is updated annually to ensure that the projects with the greatest need receive the highest priority. For any questions on the CIP plan or specific projects, please contact Stephen Dennehy, Senior Engineer, via e-mail or by phone at (425) 398-4405.

Capital Improvement Projects

Bid documents and project status for all capital improvement projects, going back approximately one year, are available below.  Use the pull down menu to filter your selection.  Projects currently bidding are also listed on the Builders Exchange website.

2017 Water Main Replacement Projects

  • Department:Engineering
  • RFP Number:2017-02
  • Start Date:02/13/2017
  • Close Date:03/01/2017 10:00 AM

Contract 2017-02; 2017 WATER MAIN REPLACEMENT PROJECTS

The project consists of the following work:

Sch. A (124/95): Install approximately 300 LF 4-inch DI water main, including road reconstruction, and general restoration, in 95th Ave. NE, just North of NE 124th St., Kirkland, WA.

Sch. B (164/112): Install approximately 25 LF 4-inch DI water main and 1,175 LF 6-inch DI water main, including half street overlay, and general restoration, in 112th Ave. NE, just North of NE 164th Pl., Bothell, WA.

Sch. C (140/84): Install approximately 1,285 LF 8-inch DI water main, including half street overlay, and general restoration, in NE 140th St., just East of 84th Ave. NE, Kirkland, WA.

Sch. D (152/61): Install approximately 780 LF 4-inch DI water main, 950 LF 8-inch DI water main, 35 LF 12-inch PVC storm drain, and 400 LF 4-inch PVC storm drain, including full road overlay, and general restoration, in 61st Pl. NE and NE 152nd St., Kenmore, WA.

Sch. E (182/64): Install approximately 295 LF 4-inch DI water main, 1,430 LF 8-inch DI water main, and 45 LF sliplined 6-inch DR 11 HDPE, including full street overlay and general restoration, in NE 182nd St. and 64th Ave. NE, Kenmore, WA.

Sch. F (141/111): Install approximately 245 LF 8-inch DI water main, including trench patch and general restoration, in 111th Ave. NE, just East of NE 141st Pl. and West of NE 141st St., Kirkland, WA.

 ORDER OF WORK:

The Contractor will construct the 141/111 Water Main Replacement as the first order of work. After the 141/111 Water Main Replacement Project is completed, the Contractor may complete the remaining schedules in any order, with the exception that the 152/61 Water Main Replacement Project be constructed during the driest time of the year (July-September) due to the potential for ground water issues; the 124/95 Water Main Replacement Project be constructed after September 1, 2017 to avoid triggering overlay requirements per the City of Kirkland standards; and the 164/112 Water Main Replacement Project be constructed after June 21, 2017 to coincide with the nearby Cedar Park School and Northshore School District summer closures.

Approximate locations of the proposed improvements are shown on the project construction plans.

The engineer’s construction cost estimate is $2,170,000.00 including sales tax.

Return to full list >>

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer