The purpose of the Capital Improvement Program (CIP) is to identify, prioritize, and construct projects that are needed to enhance or maintain the sewage collection system and the water distribution system. The projects are prioritized on the basis of health concerns, water quality concerns, growth, regulatory requirements, component reliability, system benefit, and financial needs. The CIP is updated annually to ensure that the projects with the greatest need receive the highest priority. For any questions on the CIP plan or specific projects, please contact Stephen Dennehy, Senior Engineer, via e-mail or by phone at (425) 398-4405.

Capital Improvement Projects

Bid documents and project status for all capital improvement projects, going back approximately one year, are available below.  Use the pull down menu to filter your selection.  Projects currently bidding are also listed on the Builders Exchange website.

Lift Stations No. 3 & 15 Rehabilitation; Lift Station No. 19 Generator

  • Department:Engineering
  • RFP Number:2017-01
  • Start Date:05/15/2017 6:00 AM
  • Close Date:05/31/2017 10:00 AM

Project includes rehabilitation of two existing sewer lift stations (dry well / wet well configuration) and installation of an emergency generator at another existing lift station. The rehabilitation work at Lift Stations No. 3 & 15 generally includes:

  • removal and replacement of all mechanical and electrical components
  • recoating of the interior surfaces of the dry well and wet well
  • installation of standby diesel-powered generator sets with sound attenuation enclosures
  • landscaping / restoration work.

The work at Lift Station No. 19 generally includes:

  • installation of a standby diesel-powered generator set with sound attenuation enclosure and electrical improvements
  • landscaping / restoration work.

The District has pre-purchased specific equipment for this Contract which will be provided to the Contractor for installation. A list of the pre-purchased equipment is provided on page MP2 in Section 4 – Measurement and Payment.

Approximate locations of the proposed improvements are shown on the project construction plans.

The engineer’s construction cost estimate is $766,905 including sales tax.

Return to full list >>

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer